Sr. No. |
Name of the Equipment |
Nos. |
[A] Excavators & Loaders |
||
1 |
Tata Hitachi LC-200 (Excavator) | 1 |
2 |
Tata Hitachi LC-110 (Excavator) | 1 |
3 |
JCB 3D | 1 |
4 |
JCB 4D | 1 |
5 |
Bull Mounted Tractor Loaders | 3 |
6 |
L&T Vibrato Loaders 40 tons (Roller) | 1 |
[B] Transportation |
||
1 |
Tata Dumpers | 3 |
2 |
Ashok Leyland Dumpers | 2 |
3 |
Tata HYVA | 2 |
4 |
Tempo | 2 |
5 |
Tractors With Trolley | 3 |
6 |
Water Tankers | 2 |
[C] Concrete Machinery Equipments |
||
1 |
Automatic Concrete Mixer | 2 |
2 |
Manual Concrete Mixer | 20 |
Sr. # |
Name of the Equipment |
Nos. |
10 |
Concrete Pump (40 Cu.mt/Hr capacity) | 3 |
11 |
Transit Mixer (SchwingStetter) | 1 |
12 |
Ajex Miller 4 MCu. | 1 |
Ajex Miller 2 MCu. | 1 |
|
13 |
Vibrator Machine ( Electronic/Petrol) | 4 |
15 |
Trolley (Rail system for 90mt. Lead) Tower Crain | 3 |
16 |
Tower Crain With 0.025CMT Bucket-18mt. | 4 |
[D] Survey |
||
1 |
Level Instrument (Analog) | 3 |
2 |
Level Instrument (Digital) | 2 |
3 |
Auto Level TB 2 | 1 |
4 |
Theodolite | 3 |
5 |
TotalStation | 2 |
[E] Shuttering Material |
||
1 |
Shuttering Plates | 11000 |
2 |
Steel Columns | 900 |
3 |
Acro SPAN | 400 |
4 |
Steel Props | 800 |
5 |
H Frame SCA Folding | 1600 |
6 |
M.S.40 Dia B Class SCA Folding Pipes. | 9000 |
[F] Site Setup |
||
1 |
4-Accomodation Bunk House | 1 |
2 |
8-Accomodation Bunk House | 1 |
3 |
Pickup Van (Mahindra) | 2 |
4 |
Mahindra Bolero DLX | 1 |
5 |
Motor Cycles | 15 |
6 |
LabourCampFacility | 500 |
[G] Others |
||
1 |
Soil Compactors | 3 |
2 |
Water Pumps | 22 |
3 |
Dewatering Pumps | 6 |
4 |
Screed Vibrators | 3 |
5 |
Hand Cart | 25 |
6 |
Soil Leveler | 2 |
7 |
82.5 KVA Generator Sets | 1 |
8 |
5-10 KVA Generator Sets | 5 |
9 |
125 KVA Generator Sets | 1 |
10 |
Wireless Systems (30KmsRange) | 1 |
[H] Site Laboratory Setup |
||
1 |
Compressor Testing Machine | 1 |
2 |
Soil Compaction Testing Equipment i.e. Oven, Core Cutter, Balance & required Equipments | 1 |
3 |
Material Testing (Sieve Analysis) | 2 |
4 |
Temperature Testing | 3 |
5 |
Slump Cone Set | 2 |
[I] Safety Measures Accessories |
||
1 |
Helmet For Skilled & Unskilled Labours | 500 |
2 |
Safety Belts | 150 |
3 |
Safety Shoes | 600 |
4 |
Hand Gloves | 1000 |
5 |
First Aid Box | 50 |